






Tagus Degassing & Top-Up Units
Efficient continuous degassing and automatic replenishment.
-
Description
Wilo-Tagus vac is a vacuum degasser that ensures efficient degassing of closed systems. It provides active degassing with cutting-edge technology in combination with the automatic replenishment of closed heating and cooling water systems in commercial buildings. Can be combined with a Wilo-Sinum pressure-maintaining station or with a Wilo diaphragm expansion tank with fixed gas cushion.
-
Advantages
- Central degassing of the system and replenishment liquid ensures efficient, continuous degassing and replenishment
- Turbo operating mode and external top-up contact allow for self-controlled refilling with degassed water (230 V)
- Turnkey solution ready for connection ex works
- High degree of reliability through compact and robust design
- Easy and intuitive operation via a large display
- Cutting-edge technology with high-performance venting facilitates active degassing
- Wilo-Medana integrated multistage pump
-
Technical Features
Design
Vacuum degasser.
Application
- Heating systems
- Chilled water systems
Typekey
Example: Wilo-Tagus vac 20 Tagus vac Product description 7 Efficiency class Technical Data
- Working temperature: 3 °C to 70 °C.
- Maximum (feed) supply temperature in the system: 120 °C.
- Ambient temperature: > 3 °C to 45 °C.
- Maximum pressure in the suppletion feed line: 2 to 8 bar.
- Noise production: approx. 55 dB(A).
- Electrical connection 230 V 50 Hz.
- Suitable for addition of glycol-based anti-freeze up to 30%.
- Complies with the following guidelines: Machinery Directive 2006/42/EC, PED 2014/68/EU.
- Downloads
Why Wilo Pumps…
Self-Priming
Convenient
Highly-Efficient
Noise-Free
Diversity
Optimised Design
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright