- Home
- Suppliers
- Wilo
- Electrical Accessories
- Switchgear Wilo-Control MS-Lift







-
Advantages
- Operationally reliable control of up to two pumps
- Additional operational reliability thanks to separate level recording for high water level
- Easy level measurement with float switches
- Display of operating statuses via LEDs on the switchgear
- Integrated alarm buzzer, mains-independent via 9 V battery (optionally available as accessory)
-
Technical Data
Design
Switchgear with microcontroller for level-dependent control of up to two submersible pumps.
Equipment/function
Functions
- “Drain” operating mode: For draining sewage chambers in water disposal
- Configurable overload protection
- Thermal motor monitoring
- Pump kick function for 2 sec
- Adjustable follow-up time up to 120 sec
- Pump cycling after each run (for switchgear for 2 pumps)
- Direction of rotation monitoring
- High water alarm with forced switch-on of the connected pump(s)
- Fault memory of the last fault
- Enhanced functionality when used with lifting units; e.g. display service interval
Equipment
- Lockable main switch (depending on version)
- Control panel with buttons
- Display of the current operating or fault conditions via LED
- Configurable electronic motor current monitoring
- Configuration of individual functions using dip switches and potentiometers
- Integrated alarm buzzer, mains-independent via 9V battery (optionally available as accessory)
Typekey
Example: Wilo-Control MS-L 1x4kW-DOL-x Control Switchgear MS Micro Control series L “Lift” version for water lifting applications 1 Number of pumps that can be connected 4kW Maximum rated power P2 per pump DOL Starting mode: Direct activation x Versions: without = standard version with main switch S = with cable and plug without main switch O = without cable, plug and main switch (mains isolation device must be provided by the customer!) Technical data
- Mains connection: 1~230 V, 50/60 Hz or 3~400 V, 50/60 Hz
- Max. rated power (P2) per pump: 4.0 kW
- Maximum rated current IN per pump: 12 A
- Activation type: Direct
- Control voltage: 24 V DC
- Ambient/operating temperature: -30 … +60 °C
- Storage temperature: -30 … +60 °C
- Max. relative humidity: 90 %, non-condensing
- Max. switching capacity of alarm contact/SSM: 250 V~, 1 A
- Protection class: IP54
- Electrical safety: Pollution degree II
- Housing material: Polycarbonate, UV-resistant
Construction
Switchgear with microcontroller for level-dependent control of one, two or three submersible pumps with float switch for level measurement. The parameterisation is carried out using DIP switches and potentiometers.
Inputs
1x…2x digital inputs* for float switch (pump on/off)
1x digital input for high water signal with float switch (high water alarm)
1x…2x inputs* for thermal winding monitoring with bimetallic temperature sensor. Connection of PTC sensors is not possible!
Outputs
1x potential-free contact for the collective fault signal (SSM)
1x potential-free contact for the high water alarm (for switchgear for 2 pumps)
*Depending on the number of pumps that can be connected.
Configuration
Caution! Signal transmitters are to be provided on-site. Switchgears are not protected against explosions and may only be used outside potentially explosive atmospheres. Signal transmitters within potentially explosive atmospheres must be connected through an intrinsically safe circuit, e.g. breakdown barrier or Ex cut-off relay. The direct connection of pumps within potentially explosive atmospheres is not possible!
- Downloads
Why Wilo Pumps…
Self-Priming
Convenient
Highly-Efficient
Noise-Free
Diversity
Optimised Design
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright