Keeping Bloxwich Active Living Centre Running Smoothly

Servicing Case Study

Bloxwich Active Living Centre relies on a series of Grundfos circulator pumps to keep its water systems running efficiently. When one pump developed a leaking mechanical seal, others triggered alarm signals, and another became noticeably noisy, the centre needed a fast, reliable response to avoid downtime and disruption.

IMG_2216

Our Approach

Trebles’ service engineers carried out a full inspection of the plantroom equipment, addressing each issue systematically:

Faulty Seal
One circulator pump with a leaking mechanical seal was identified and replaced, restoring reliable operation.

Alarm Checks
Units showing alarm lights were thoroughly checked and tested to confirm there were no underlying issues, giving the client confidence that the equipment was safe to run.

Noisy Pump Investigation
A noisy circulator pump was found to be cavitating due to a heavily clogged strainer restricting water flow. The team cleaned and replaced the strainer, ensuring proper flow to the system. To prevent further damage, the noisy pump was removed and replaced with a blanking plate. This allowed Trebles’ engineers to return the pump to the service department for a detailed inspection. Early indications suggested possible wear ring and bearing damage, but full confirmation would come from a complete strip-down and assessment.

The Outcome

By acting quickly and methodically, Trebles ensured that the Leisure Centre’s water systems remained operational with minimal disruption.

The plantroom now runs more reliably, with issues resolved before they could escalate into larger failures. This proactive approach not only fixed immediate problems but also gave the client peace of mind that their equipment is in safe hands, supported by Trebles’ technical expertise and responsive service team.

On-site Imagery

The job involved diagnosing the fault, sourcing the right replacement components, and carrying out on-site repairs with minimal downtime. By completing the work quickly and efficiently, we ensured the leisure centre could continue to provide a safe and reliable environment for its visitors.

This project highlights our commitment to fast response times, expert knowledge of pump systems, and delivering practical solutions that keep essential facilities running smoothly.

IMG_2216
Electrical testing of equipment
previous arrow
next arrow
Helmet cog icon

Customer

Bloxwich Active Living Centre

Calculator icon

Challenge

One pump developed a leaking mechanical seal, others triggered alarm signals, and another became noticeably noisy, the centre needed a fast, reliable response to avoid downtime and disruption.

Lightbulb icon

Solution

Trebles’ service engineers carried out a full inspection of the plantroom equipment, addressing each issue systematically. Faulty Seal replacement. Alarm Checks. Noisy Pump Investigation and strainer Cleaning. Pump service for detailed possible damage inspection and assessment.

save-energy 2

Benefits

By acting quickly and methodically, Trebles ensured that the Leisure Centre’s water systems remained operational with minimal disruption. The plantroom now runs more reliably, with issues resolved before they could escalate into larger failures. This proactive approach not only fixed immediate problems but also gave the client peace of mind that their equipment is in safe hands, supported by Trebles’ technical expertise and responsive service team.

Contact us

Helping you to build and develop your business

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Please attach any useful and relevant documents that might help speed things up (e.g. job spec)
Drop files here or
Max. file size: 50 MB.