Servicing Case Study
The Deansgate Luxury Offices site in Wolverhampton collects rainwater from the building’s guttering, storing it in a wet well before discharging to the sewer system for treatment.
However, the existing ultrasonic level sensor had failed, and the control panel was no longer compatible with modern monitoring equipment.
The Challenge
Without a working ultrasonic level sensor, the site lacked reliable water level monitoring. This created a risk of overflow and reduced the efficiency of the rainwater management system. The client required a modern solution that could provide accurate, real-time monitoring while integrating seamlessly with a new compatible control panel.
Our Approach
Trebles’ engineers removed the failed ultrasonic level sensor from the wet well and installed a new head capable of delivering precise and dependable monitoring. The outdated control panel was also replaced with a modern Pulsar unit, which provides full compatibility with the new equipment. Once fitted, the system was tested and calibrated to ensure accurate performance, with all work completed efficiently and with minimal disruption to site operations.
The Outcome
The upgraded system now provides accurate, real-time monitoring of rainwater levels, ensuring the wet well functions as intended. With the new ultrasonic sensor and Pulsar control panel in place, the risk of overflow has been significantly reduced, while reliability, efficiency, and ease of maintenance have all been greatly improved.
On-site Imagery
The job involved diagnosing the fault, sourcing the right replacement components, and carrying out on-site repairs with minimal downtime. By completing the work quickly and efficiently, we ensured our client could continue to provide a safe and reliable environment for its visitors.
This project highlights our commitment to fast response times, expert knowledge of pump systems, and delivering practical solutions that keep facilities running smoothly.
Other Success Stories
Helping the London Museum of Water & Steam Pump Sustainably
Trebles partnered with the London Museum of Water & Steam…
Keeping Bloxwich Active Living Centre Running Smoothly
Servicing Case Study Bloxwich Active Living Centre relies on a series…
Royal Orthopaedic Hospital Booster Set Commissioning
Servicing Case Study The Royal Orthopaedic Hospital in Birmingham required a…
Other News Items
Trebles Appoint Olly Penn as a New Area Sales Manager
Trebles Appoint Olly Penn as a New Area Sales Manager Meet Olly, the newest addition to the Trebles sales…
Trebles Launch New Manufacturing Product Guide
Trebles Unveils New Overview Brochure We are pleased to announce the launch of our new Trebles Own-Built Product Guide,…
New Signage at Wolverhampton HQ
New Signage at Wolverhampton HQ Last week, we got new signage installed at our Wolverhampton site. One site down, with…








