

Wilo-VeroLine-IP-Z
Glanded circulator in in-line design with threaded connection.
-
Description
Glanded circulator in in-line design with threaded connection.
-
Advantages
- High resistance to corrosive fluids due to stainless steel housing and Noryl impeller
- Wide range of applications due to suitability for water hardness up to 5 mmol/l (28 °dH)
- All components that come in contact with the fluid comply with the latest directives.
-
Technical Features
Design
Glanded circulator in in-line design with threaded connection.
Application
-
For pumping drinking water, cold and hot water (in accordance with VDI 2035) without abrasive substances, in heating, chilled water and cooling water systems.
Typekey
Example Wilo-VeroLine‐IP‐Z 25/6 IP In-line pump (screw-end pump) ‐Z Circulation pump 25/ Nominal connection diameter Rp 6 Power capacity in convergence with max. delivery head [m] Technical data
- Permissible temperature range
- Drinking water up to 5 mmol/l (28 °dH): max. +80 °C, in short-term operation (2 h) up to +110 °C
- Heating water: -8 °C to +110 ° C)
- Mains connection 1~230 V, 50 Hz or 3~230/400 V, 50 Hz
- Protection class IP 44 motor, IP 54 terminal box
- Nominal diameter Rp 1
- Max. operating pressure 10 bar
Materials
- Pump housing and lantern: 1.4306
- Impeller: Noryl
- Shaft: 1.4571
- Mechanical seal: Ceramic/graphite/EPDM
Construction
Single-stage, low-pressure centrifugal pump in in-line design with
- Mechanical seal
- Threaded connection
- Motor with one-piece shaft
Accessories
- Adapters
-
-
Downloads
Click Below to Download:
Wilo-VeroLine-IP-Z
Consulting Manual – Glanded Pumps. Single-stage, single-volute
Certification Booklet – Wilo-VeroLine-IP-E, Wilo-VeroTwin-DP-E, Wilo-VeroLine-IPL, Wilo-VeroTwin-DPL, Wilo-VeroLine-IPL-N, Wilo-VeroTwin-DPL-N, Wilo-VeroLine-IPH, Wilo-BM/BM-B/BM-S, Wilo-VeroLine-IP-Z
Group Statement REACH
UKCA 2215792
Why Wilo Pumps…
Self-Priming
Convenient
Highly-Efficient
Noise-Free
Diversity
Optimised Design
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright