






Wilo-Savus OPTI-DECA
A positive control discharge unit that is decoupled from the fluid.
-
Description
A positive control discharge unit that is decoupled from the fluid.
-
Advantages
- Effective and safe clear water removal to ensure the sewage is cleaned to a high quality
- High process reliability owing to permanently installed system which is decoupled from the fluid
- Universally customisable and modifiable decanting technology owing to individually system-tailored design
- No contamination thanks to process-related cycling of the decanting process
-
Technical Features
Design
A positive control discharge unit that is decoupled from the fluid.
Application
-
Unit to effectively discharge clear water in SBR systems
Equipment/function
The clear water discharge phase at the end of a process cycle is a crucial process step in ensuring the quality of the treated sewage. Only the cleaned sewage may pass into the outflow, floating matter must be safely held back.
During the previous treatment phases (infeed, aeration, stirring and sedimentation) the discharge unit has been positioned at a safety distance above the maximum possible water level. Upon starting the discharge process the discharge unit is gradually lowered using an electrically operated winch and the discharge pipe is immersed in the clear water zone. As a rule, the clear water is fed in below the dropping water level to retain floating sludge. Draining is done by gravity.
The discharge process has been completed upon reaching the minimum surfacing height as well as the bottom end position and the discharge unit is moved up to its initial position.
Technical Data
- Drainage quantity: 200 … 1000 m³/h
- Discharge pipe: DN 200 … DN 300
- Drain pipe: DN 200 … DN 400
Drainage quantities greater than 1000 m³/h upon request.
Materials
- Discharge unit: A2/A4 stainless steel
- Drainage unit: A2/A4 stainless steel
- Wall bracket: A2/A4 stainless steel
- Supports: A2/A4 stainless steel
Construction
The discharge device consists of a horizontally arranged discharge unit and a drainage unit. The discharge unit features a rigid floating sludge barrier. The drainage unit is connected to the on-site drain pipe by a joint.
An electric winch is used to raise and lower the decanter. The electric winch consists of a geared brake motor and a cable drum. The upper and lower switch-off points are set using the limit switches. The discharge device can be supported on supports installed in the basin for maintenance and installation.
Option
- Geared brake motor with integrated frequency converter
- On-site control point
- Floating sludge barrier with variable discharge opening
-
- Downloads
Why Wilo Pumps…
Self-Priming
Convenient
Highly-Efficient
Noise-Free
Diversity
Optimised Design
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright