



















Wilo-HiDrainlift 3
Small sewage lifting unit for floor-mounted installation.
-
Description
Small sewage lifting unit for floor-mounted installation.
-
Advantages
- Very compact construction for installation in a wet area or under the shower tray (HiDrainlift 3-24)
- Low-noise operation and installed active carbon filter for high user comfort
- Reliable capacity and low electricity consumption for efficient wastewater disposal
- Simple installation with flexible connection options
- Systems ready for connection (HiDrainlift 3-35 and HiDrainlift 3-37)
-
Technical Features
Design
Small sewage lifting unit for floor-mounted installation
Application
Pumping of pre-cleaned sewage without faeces (according to DIN EN 12050-2) that cannot be piped to the sewer system via a natural downward slope.
Equipment/function
- Ready-to-plug
- Thermal motor protection
- Level checking via a pneumatic pressure transducer
- Integrated non-return valve
- Fixation material
- Active carbon filter
Typekey
Example: HiDrainlift 3-35 HiDrainlift Product family:Wastewater lifting unit 3 Product level 3 = Standard 3 Number of inlet connections 5 Rated delivery head in m Technical data
- Mains connection 1~230 V, 50 Hz
- Mains connection cable 1.5 m, with shock-proof plug
- Fluid temperature max. 35 °C (up to 60/ 75 °C in short-time duty for 5 minutes, depending on the model)
- Pressure connection DN 32
- Inlet connection DN 40
- Protection class IP 44
- Gross tank volume 3.9 l / 16 l / 15.5 l
- Switching volume 1.7 l / 2 l / 2 l
Materials
- Pump housing: PPGF30
- Motor housing: PPGF30
- Gasket: EPDM
- Tank material: PP
Construction
Ready-for-connection, automatically-switching wastewater lifting unit with built-in non-return valve and 2-3 inlet connecting pieces (depending on model). Odour-free exhaust ventilation into the installation room is implemented by means of an integrated active carbon filter.
-
Downloads
Click Below to Download:
Wilo-HiSewlift
Wilo-HiDrainLift 3 Certification Booklet
Group Statement REACH
UKCA 2223540
Why Wilo Pumps…
Self-Priming
Convenient
Highly-Efficient
Noise-Free
Diversity
Optimised Design
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright