

Wilo-Drain VC
Vertical pedestal-type non-submersible drainage pump with standard motor.
-
Description
Vertical pedestal-type non-submersible drainage pump with standard motor.
-
Advantages
- For fluid temperatures up to 95 °C
- Long service life, even in the event of long periods of standstill
- Easy operation due to the attached float switch
-
Technical Features
Design
Vertical pedestal-type non-submersible drainage pump with standard motor.
Application
Pumping of Wastewater with a maximum fluid temperature of 95 °C
Equipment/function
- A float switch is fitted which has adjustable switching points
Technical Data
- Mains connection: 1~230 V, 50 Hz or 3~400 V, 50 Hz
- Fluid temperature: 3 … 95 °C
- Operating mode: S3 25%
- Pressure port:
- VC 32: R 1
- VC 40: R 1½
- Protection class: IP54
Materials
- VC 32
- Motor housing: Al
- Pump housing: EN-GJL-250
- Impeller: 1.4028
- Shaft: Stainless steel
- Float: PP
VC 40
- Motor housing: Al
- Pump housing: EN-GJL-250
- Impeller: EN-GJL-250
- Shaft: Stainless steel
- Float: PP
Construction
Vertical pedestal-type centrifugal pump equipped with a float switch for stationary installation.
Single-stage hydraulics with semi-open, multi-channel impeller and horizontal pressure port. An inlet filter is integrated into the suction area of the hydraulics. Drive is provided by a standard motor. Hydraulics and motor are rigidly connected via the pump shaft (in the shaft protection pipe). The pump shaft is located by a plain bearing and the plain bearing is lubricated by the fluid.
A float switch is fitted for automatic operation. Switching points can be set using stops.
Accessories
- Connection cable
- Motor protection plug
- Connection cable kit:
- 5 m connection cable
- Motor protection plug
- Downloads
Why Wilo Pumps…
Self-Priming
Convenient
Highly-Efficient
Noise-Free
Diversity
Optimised Design
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright