









-
Description
Glanded pump in block design with flange connection.
-
Advantages
- Compact block design with directly flanged three-phase current motor and one-piece motor pump shaft
- Can be used in many applications due to material made of cast stainless steel (BM-S) and cast bronze (BM-B)
- Meets user requirements due to performance and main dimensions in accordance with EN 733 (DIN for standard pumps)
- Standard-equipped feet on pump housing and motor for installation on a base
-
Technical Features
Design
Glanded pump in block design with flange connection
Application
-
For pumping heating water (in accordance with VDI 2035), water-glycol mixtures, cooling water and chilled water without abrasive substances in heating, chilled water and cooling water systems.
Typekey
NO VALUE Technical data
-
- Minimum efficiency index (MEI) ≥ 0.4
- Permissible temperature range of -10 °C to +90 °C
- Mains connection 3~400 V, 50 Hz
- Protection class IP55
- Nominal diameter DN 32 to DN 125
- Max. operating pressure 10 bar
Materials
- Pump housing BM-B: Bronze CuSn10
- Pump housing BM-S: Cast stainless steel 1.4408
- Impeller BM-B: Bronze CuSn 10
- Impeller BM-S: Cast stainless steel 1.4408
- Shaft: 1,4362
- Mechanical seal: Q1Q1VGG
Construction
- Single-stage glanded centrifugal pump in compact block design made of cast stainless steel
- Directly flanged three-phase current motor and one-piece motor pump shaft
- Mechanical seal
- Feet on pump housing and motor
Option
- Version …-K3 with PTC thermistor sensor (for a surcharge)
- Other mechanical seals on reques
-
- Downloads
Why Wilo Pumps…
Self-Priming
Convenient
Highly-Efficient
Noise-Free
Diversity
Optimised Design
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright