- Home
- Suppliers
- Wilo
- Mechanical Accessories
- Port 800










-
Advantages
- Chamber covers that can be directly mounted on the chamber allow driving over – even by heavy-duty vehicles
- A continuously variable pump chamber extension of up to 2.75 m allows for flexible adjustment during the installation phase
- One-piece chamber body up to 2.25 m offers maximum operational reliability and protection against leakage
- The use of corrosion-free materials ensures a long service life
- Surface coupling allows for easy maintenance with readily accessible valves
- Light polyethylene chamber body and integrated inlet connections enable an easy installation
- Circumferential chamber ribs make the chamber body anti-buoyant without additional ballast
-
Technical Data
Design
Pump chamber made of plastic for concealed floor installation
Application
Pumps sewage without faeces (version D) and with faeces (version B):
- In cases where sewage cannot be led to the sewer system via a natural downward slope.
- For the backflow resistant drainage in cases where the discharge point is below the backflow level.
Typekey
Example: Wilo-Port 800.1-1750-03B 800 Pump chamber diameter in mm 1 Number of pumps 1750 Monolithic over-all height in mm 03 Discharge outlet: - 03 = R 1¼
- 04 = R 1½
B Version for Wilo pump - B = Rexa MINI3-S, Rexa FIT-S, Rexa PRO-S, Rexa CUT
- D = Rexa MINI3
Technical data
- Monolithic pump chamber heights: 1750, 2250 mm
- Max. pump chamber height with extension: 2750 mm
- Pump chamber diameter: 800 mm
- Connection port (closed): 1x DN 100, 2x DN 150, 1x DN 200
- Discharge outlet with male thread:
- Version “B” = R 1¼
- Version “D” = R 1½
- Connection for flushing/vacuum relief valve: Rp 1
Materials
- Pump chamber: PE
- Pipework: Stainless steel
- Cross member: Stainless steel
- Gate valve: Red brass
- Non-return ball valve: EN-GJL with corrosion-resistant powder coating
- Surface coupling: EN-GJL with corrosion-resistant powder coating
- Chain: Stainless steel
Construction
Ready-to-install plastic pump chamber in monolithic design without gasket surfaces with deposit-free pump chamber geometry and crane eyes for easy relocation and transport. Anti-buoyant against ground water up to the top edge of the ground without additional concrete weights provided by the customer. Complete pipework with surface coupling for quick and easy pump installation, a sleeve gate valve and a removable non-return ball valve. The non-return ball valve is installed directly on the discharge port of the pump. Includes pump chain as lifting equipment for the pump.
The pipework also offers additional connections for a flush connection and a vacuum relief valve. The chamber cover is available in classes A 15, B 125 and D 400.
Configuration
- Only install outside of buildings.
- Do not install in the immediate vicinity of living and sleeping areas.
- Do not install the pump chamber in peaty soils.
- Max. height adjustment:
- with concrete rings: 200 mm
- with plastic pump chamber extension: 500 mm
- Chamber cover D 400: customer must install a load distribution plate!
- The load distribution plate must rest fully on the substructure! The load distribution plate must not rest on the pump chamber.
- Dimensions: External Ø: 1700 mm; internal Ø: 700 mm; strength Ø: 300 mm
- Concrete quality: C 35/45; reinforcement: Reinforcing steel B500A
- Spacing: 150 mm lengthwise + crosswise, top + bottom
- Downloads
Why Wilo Pumps…
Self-Priming
Convenient
Highly-Efficient
Noise-Free
Diversity
Optimised Design
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright