

-
Description
Channel depth: up to 11 m – greater depths on request
Channel width: up to 3.2 m – greater widths on request
Perforation: 2 to 12 mm
Installation angle: 45 to 75° – other angles on request
-
Advantages
- High reliability through robust construction – no need for upstream coarse screening
- The filter screen allows the passage of grit without malfunctioning
- Discharge of grease in large quantities presents no problem Highest possible cleaning effect via perforated filter elements
- Discharge of coarse matter through tines on the filter elements
- Filter elements optimally cleaned as result of their shape (segment of circle)
- Screenings conveyed positively to the discharge point
- Excellent cost/performance ratio
- Low maintenance costs
- Suitable for outdoor sites/ operation in winter
- Easily adapted to suit changed operating conditions
- Machine completely hygienically encapsulated
- The filter screen has proved itself in hundreds of applications at home and abroad
-
Technical Features
Design
Fine screen with high screenings retention
Application
Applications in municipal and industrial clarification plant
- wastewater pre-treatment / fine screening
- pumping stations
- pre-screening before diaphragm installation
- sludge screening / secondary sludge
- sludge screening / primary sludge
- sea water treatment
- rainwater tank overflow and storage channel screening
- septge reception and treatment
Applications in the paper and cellulose industry
- wash water, unbarking installations
- coarse matter runoff, channel water
Applications in power stations
- cooling and service water screening (river intake etc.)
- sea water screening
Industrial applications
- cooling and wastewater screening (river intake etc.)
- sea water screening
- textile and textile finishing industry – preliminary clarification of total wastewater
- meat, fish, and poultry processing / slaughterhouses – preliminary clarification of total wastewater
- sugar industry – preliminary clarification of total wastewater
- composting installations, waste product and disposal engineering, seepage water treatment
- fruit and vegetable processing – preliminary clarification of total wastewater
- breweries – preliminary clarification of total wastewater
- animal processing – preliminary clarification of total wastewater removal of algae
- Downloads
Why Wilo Pumps…
Self-Priming
Convenient
Highly-Efficient
Noise-Free
Diversity
Optimised Design
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright