






DVS
Submersible pump with anti-clogging semi-vortex impeller in cast iron capable of pumping foreign bodies up to 70% of the diameter of the discharge outlet. Available only in three-phase version and with the possibility of use in fixed and mobile installations. Suitable for heavy-duty use in residential and industrial applications.
-
Description
Overview:
Submersible pump with cast iron anti-clogging semi-vortex impeller capable of pumping of foreign bodies up to 70% of the discharge outlet’s diameter while retaining ease of maintenance.
The DVS electric pump is only available in a three-phase version and can be used in fixed and mobile installations.
For further technical information see the Databook• Pumping of wastewater with solid or fibrous materials
• Pumping of industrial wastewater
• Drainage -
Technical Features
Technical data
Flow rate up to 60 m³/h Total head up to 23 m Max. temperature of the liquid +40°C Poles 2 Max. solids passage 21 mm (50DVS)
33 mm (65DVS and 80DVS 1.5 kW)
41 mm (65DVS and 80DVS 2.2-3.7 kW)Insulation class F Protection degree IP68 Voltage Three-phase 3~380-415±10% Max. immersion up to 1.5kW:
3 m with 6 m cable
over 1.5kW:
7 m with 10 m cableMax. length of fibres 100 mm (50DVS)
200 mm (65DVS and 80DVS 1.5 kW)
245 mm (65DVS and 80DVS 2.2-3.7 kW)Materials
Pump body Cast iron Impeller Cast iron Shaft Stainless steel AISI 403 (EN 1.4006) Mechanical seal Impeller side: Silicon carbide/Silicon carbide/NBR
Motor side: Carbon/Ceramic/NBR - Downloads
Why Ebara Pumps…
Product Quality
Tailored Solutions
Eco-friendly
Multiple Sectors
Range of Products
Product Development
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright