- Home
- Suppliers
- Ebara
- Submersible Drainage Pumps
- Wastewater Lift Pumps
- DMLV – DMLVF







DMLV – DMLVF
Cast iron submersible pump with vortex impeller that facilitates the passage of solids and prevents clogging, usable in fixed and mobile installations. Suitable for pumping wastewater with suspended solids.
-
Description
Overview:
Cast iron submersible pump with vortex impeller that facilitates the passage of solids and prevents clogging, usable in fixed and mobile installations.
DMLV – DMLVF electric pumps are advanced technical solutions that provide high-level performance, especially in heavy-duty applications.
For further technical information see the Databook• Soiled liquids
• Civil and industrial wastewater or liquids containing solid and/or filamentary substances in suspension -
Technical Features
Technical data
Flow rate up to 168 m³/h (DMLV)
up to 200 m³/h (DMLVF)Total head up to 41.3 m (DML)
up to 29.4 m (DMLVF)Max. temperature of the liquid +40°C Poles 2, 4, 6 Max. solids passage 80÷100 mm (DMLV)
30÷80 mm (DMLVF)Insulation class F (DMLV)
H (DMLVF)Protection degree IP68 Voltage Three-phase 3~380-415V -10 +6%
(DMLV 2.2 kW) – DOL
Three-phase 3~380-415V ±10%
(DMLV 3.7÷22 kW) – Y/Δ
Single-phase 1~230V ±10% (DMLVF)
Three-phase 3~400/690V ±10% (DMLVF)Max. immersion 7 m with 10 m cable Max. length of fibres 400 mm (80DMLV)
500 mm (100DMLV)Materials
Pump body Cast iron Impeller Cast iron Shaft Stainless steel AISI 403 (EN 1.4006) (DMLV)
Stainless steel 420B (EN 1.4028) (DMLVF)Mechanical seal Impeller side: Silicon carbide/Silicon carbide/NBR
Motor side: Carbon/Ceramic/NBR - Downloads
Why Ebara Pumps…
Product Quality
Tailored Solutions
Eco-friendly
Multiple Sectors
Range of Products
Product Development
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright