- Home
- Suppliers
- Ebara
- Pressure Boosting & Firefighting Sets
- Variable Speed Units
- 2GPE E-SPD+ UK
2GPE E-SPD+ UK
Pressure boosters with two three-phase horizontal or vertical pumps, with hydraulics in AISI 304 or AISI 316 and special mechanical seals on request, with integrated E-SPD inverter. Used for water supply for distribution networks in the building services and general industry sectors and domestic pressurisation.
-
Description
Overview:
Pressure boosters with two three-phase horizontal or vertical pumps with E-SPD, the new generation EBARA inverter.
The 2GPE E-SPD stands out for its high flexibility. In fact, several special solutions are available, hydraulics entirely in AISI 304 or AISI 316 steel, pumps in special materials and mechanical seals to better meet the demands of industrial applications.
An essential characteristic of pressure boosters is their versatility due to the different versions produced:• 2GPE MATRIX E-SPD, pressure booster with two three-phase AISI 304 horizontal multistage pumps
• 2GPE EVMS E-SPD, pressure booster with two three-phase vertical multistage pumpsFor further technical information consult the Databook
Note: other configurations of pressure boosters with different pumps available on request• Water supply for distribution networks in the building services sector
• Water supply for industry in general
• Irrigation of gardens, parks and sports fields
• Water treatment
• Vehicle washing -
Technical Features
Technical data
Max. working pressure 10 bar for 2GPE CVM/MATRIX/COMPACT
16 bar for 2GPE EVMSGMax. temperature of the liquid +40°C for 2GPE COMPACT/CVM
+80°C for 2GPE MATRIX/EVMSGPoles 2 Insulation class F Protection degree IP44 for 2GPE COMPACT/CVM
IP55 for 2GPE MATRIX/EVMSVoltage Single-phase 1~230V ±10%
Three-phase 3~400V ±10% -
Downloads
Click Below to Download:
Why Ebara Pumps…
Product Quality
Tailored Solutions
Eco-friendly
Multiple Sectors
Range of Products
Product Development
What Trebles Customers Think
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright