- Home
- Suppliers
- Ebara
- Control Panels & Systems
- Control Systems
- Servopress


Servopress
Automatic electronic device that regulates the operation of electric pumps without using autoclave tanks.
-
Description
Overview:
Automatic electronic device that regulates the operation of electric pumps without using autoclave tanks.
SERVOPRESS controls the pump’s start and automatic stop when a utility connected to the installation is opened or closed, keeping the pump running as long as any utility remains open, ensuring the required flow rate to the network.
The electronic device also provides dry run protection, automatic reset in case of dry run protection operation and an anti-blocking function.SERVOPRESS is available in 3 models
– Fixed restart 1.5bar
– Fixed restart 2.2bar
– Adjustable restart at 1.5-2-2.5bar (LP SET model)
All the SERVOPRESS devices are equipped with pressure gauge as standard -
Technical Features
Technical data
Max. working pressure 10 bar Max. temperature of the liquid +65°C Protection degree IP65 Connections Threaded 1″ Max. phase current 16 (8) A Main supply 115/230V for ServoPress LP
230V for ServoPress LP SET MRestart pressure 1.5 bar for ServoPress LP 1.5 BAR
2.2 bar for ServoPress LP 2.2 BAR
1.5-2.2-2.5 bar for ServoPress LP SET MRestart Fixed for ServoPress LP
Settable for ServoPress LP SET M - Downloads
Why Ebara Pumps…
Product Quality
Tailored Solutions
Eco-friendly
Multiple Sectors
Range of Products
Product Development
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright