






Ego T
Circulators with integrated electronic control with permanent magnet rotor with possibility of continuous adjustment of operation according to the system’s real demands. Applied for the circulation of hot and cold water in air conditioning and heating systems and solar systems.
-
Description
Overview:
Circulators with integrated electronic control with permanent magnet rotor that differ from standard fixed speed circulation pumps by allowing continuous adjustment of operation according to the real demands of the system, obtaining significant savings in electrical energy and a reduced noise level.
For further technical information see the Databook• Circulation of hot and cold water
• Centralised, domestic air conditioning and heating systems
• Constant or variable flow solar systems where optimisation of the operating point is required -
Technical Features
Technical data
Flow rate from 0.6 to 3.6 m³/h Total head from 0.7 to 8.0 m Max. working pressure 10 bar Max. ambient temperature 0 ÷ +40°C Max. temperature of the liquid -10°C ÷ +110°C Insulation class F Protection degree IP44 Voltage Single phase 1~230V Connections G1 / G1¼ Max. glycol quantity 20% Min. suction pressure 0.05 bar at 50°C
0.4 bar at 80°C
1.1 bar at 110°CMaterials
Pump body Cast iron with cataphoretic coating Impeller Technopolymer Shaft Ceramic Rotor can Stainless steel AISI 316 (EN 1.4401) - Downloads
Why Ebara Pumps…
Product Quality
Tailored Solutions
Eco-friendly
Multiple Sectors
Range of Products
Product Development
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright