






IDROGO
5″ submerged pump with stainless steel outer casing and glass fibre reinforced PPE impellers, built with double mechanical seal in oil chamber. Equipped with 20 metres of cable, it is easy to install and suitable for vertical and horizontal operations. The single-phase version with float switch (called “A” version) is also available on request.
-
Description
Overview:
5″ submerged pump with stainless steel outer casing and glass fibre reinforced PPE impellers.
The IDROGO electric pump is reliable and corrosion-resistant, also due to the technical solutions adopted in its construction, such as the double mechanical seal in the oil chamber.
This pump is easy to install because it comes with 20 metres of cable for immediate installation and is suitable for vertical and horizontal operation.
The single-phase version with float switch (called ‘A’ version) on request.
The 5 or 10-metre key float with counterweight, supplied on request, is a useful and effective accessory and allows you to control the pump’s start and stop based on the level of water present in the tank or well.
For further technical information see the Databook• Handling of clear water from wells, cisterns and primary collection tanks
• Pressurisation of domestic systems
• Small-scale irrigation
• Vehicle washing
• Pressure boosting in general -
Technical Features
Technical data
Flow rate from 1.2 to 7.2 m³/h Total head from 10 m to 76 m Max. working pressure 10 bar Max. temperature of the liquid +40°C Poles 2 Insulation class F Protection degree IP68 Voltage Single-phase 1~230V ±10%
Three-phase 3~230/400V ±10%Materials
Impeller PPE+PS with glass fibres Shaft Stainless steel AISI 431 (EN 1.4057) Mechanical seal Carbon/Ceramic/NBR (motor side)
Silicon Carbide/Carbon/NBR (pump side)Outer casing Stainless steel AISI 304 (EN 1.4301) - Downloads
Why Ebara Pumps…
Product Quality
Tailored Solutions
Eco-friendly
Multiple Sectors
Range of Products
Product Development
What Trebles Customers Think
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright