- Home
- Suppliers
- DAB
- Fire Fighting Systems
- S4, SS 6, SS 7, SS 8 – EN 12845
S4, SS 6, SS 7, SS 8 – EN 12845
Fire-fighting pump groups made according to the specifications of the European standard UNI EN 12845. Fixed fire-fighting installations-automatic sprinkler systems.
-
Description
Overview:
Fire-fighting pump groups made according to the specifications of the European standard UNI EN 12845. Fixed fire-fighting installations-automatic sprinkler systems. All pumps (main and jockey) are equipped with 15 meter power input cable. The 6″ – 7″ – 8″ pumps are fully made of AISI 304 stainless steel.
Operating range: from 4 to 160 m3/h
Pumped liquid: clean, free of solids and abrasives, non-viscous, nonaggressive, non-crystallised and chemically neutral, with properties similar to water
Pumped liquid temperature range: from -15 to 70 °C
Maximum ambient temperature: + 25 °C
Maximum operating pressure: 16 bar (1600kPa) PN16 - Downloads
Why DAB Pumps…
Energy Saving
Quiet Operation
Easy Maintenance
Multiple Applications
Advanced Tech
Eco-friendly
What Trebles Customers Think
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright