- Home
- Suppliers
- DAB
- Accessories
- EsyTwin
EsyTwin
ESYTWINis used to be able to mount 2 Qty ESYBOX’s side by side for systems where either a larger flow or a where stand-by pump is required.
-
Description
Overview:
ESYTWIN is used to be able to mount 2 Qty ESYBOX’s side by side for systems where either a larger flow or a where stand-by pump is required.
The suction and discharge 1″ ¼ NPT connection can be made at either side of the dock or on the same side to make piping up the dock as easy as possible.
BENEFITS:
- INCREASING CAPACITY
- INCREASING THE RELIABILITY
- WIRELESS COMMUNICATION
The ESYBOX’s can comunicate with each other without a cable, by means of wireless Communications of up to 4 ESYBOX’s that can talk to each other to allow for easy set-up and duty rotation.
The whole pump is mounted in a sound-proof closed ABS housing.
Thanks to the inverter and synchronous motor esybox there will be a huge energy saving with no pressure surges and less stress on pipes & fittings.
- Downloads
Why DAB Pumps…
Energy Saving
Quiet Operation
Easy Maintenance
Multiple Applications
Advanced Tech
Eco-friendly
What Trebles Customers Think
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright