Trebles Supply & Commission New Booster Set for NHS
As part of a preventative maintenance plan at the height of the pandemic, this large Nottinghamshire based hospital needed to replace its existing booster sets which had been in place since the hospital was first built in the early 2000s…
NHS Covid Compliant Booster Set Replacement
As part of a preventative maintenance plan at the height of the pandemic, this large Nottinghamshire based hospital needed to replace its existing booster sets which had been in place since the hospital was first built in the early 2000s.
“Early in 2020 the hospital highlighted the need to look to replace its existing booster sets. This was when they contacted the Powergas team to assist with the job. The then sudden change to day-to-day running and risk management for the hospital caused by the Covid-19 outbreak, expedited the need to get replacement units in, in order to mitigate risk of any downtime.’
Carl Berridge, Managing Director, Powergas
Berridge continues,
‘On being commissioned to carry out the job, we turned to Trebles to assist with advising on the most economical, yet high quality products for the job. We have worked with Trebles for several years, so we know we can trust their technical expertise and ability to get the right products and turn them around within a quick timeframe – and this service was not affected at all by the Covid situation.”

On delivery of the Lowara units to the hospital the Powergas team installed the pumps. Trebles engineers then went to the site to commission the sets.
Gary Stott, Area Manager, Trebles, adds,
“Jobs like this are the norm for us, however one area that added some extra challenges was Covid. This job was delivered and commissioned in the hospital during April – which was when everyone was having to quickly adapt to a very new but very different normal.”
Carl Berridge, closes,
“The very fact that this job was delivered and commissioned at the height of the pandemic but with no changes to the excellent service received, really is the best praise I can give the Trebles team. It goes some way to show that whatever the difficulty, Trebles can resolve it.”
Other Success Stories
Royal Orthopaedic Hospital Booster Set Commissioning
Servicing Case Study The Royal Orthopaedic Hospital in Birmingham required a…
Keeping Bloxwich Active Living Centre Running Smoothly
Servicing Case Study Bloxwich Active Living Centre relies on a series…
Deansgate Wet Well System Upgrade
Servicing Case Study The Deansgate Luxury Offices site in Wolverhampton collects…
Other News Items
Trebles Appoint Olly Penn as a New Area Sales Manager
Trebles Appoint Olly Penn as a New Area Sales Manager Meet Olly, the newest addition to the Trebles sales…
Trebles Launch New Manufacturing Product Guide
Trebles Unveils New Overview Brochure We are pleased to announce the launch of our new Trebles Own-Built Product Guide,…
New Signage at Wolverhampton HQ
New Signage at Wolverhampton HQ Last week, we got new signage installed at our Wolverhampton site. One site down, with…