Wilo-Rexa PRO

Submersible sewage pump for continuous duty for stationary and portable wet installation, as well as for stationary dry installation.

Enquire About This Product

  • Description

    Submersible sewage pump for continuous duty for stationary and portable wet installation, as well as for stationary dry installation.

  • Advantages
    • Highly effective thanks to efficiency-optimized single-channel impellers
    • Safe to operate due to low-clogging vortex impellers
    • Verified safety: Ex-rated in accordance with ATEX as standard
    • Energy-efficient IE3 motor technology available as an option
  • Technical Features

    Design

    Submersible sewage pump for continuous duty for stationary and portable wet installation, as well as for stationary dry installation.

     

    Application

    Pumping of:

    • Untreated sewage
    • Sewage containing faeces in accordance with (DIN) EN 12050-1
    • Wastewater

     

    Equipment/function
    • Leakage detection for the motor compartment
    • Winding temperature monitoring with bimetallic strip
    • Optional external pencil electrode for sealing chamber control
    • Single-phase version with capacitor switchgear

     

    Typekey
    Example: Wilo-Rexa PRO V06DA-110/EAD1X2-T0015-540-O
    PRO Series name
    V Impeller type:

    V = Vortex impeller

    C = Single-channel impeller

    06 Nominal diameter of pressure connection e.g. DN 65
    D Hydraulic versionD = suction side drilled in accordance with DINN = suction side drilled in accordance with ANSI (North American Standard)
    A Material version, hydraulics
    110 Hydraulics definition
    E Motor versionE = dry motorrR = power-reduced motor
    A Material version, motor
    D Seal versionD = with two independent mechanical shaft seals
    1 IE efficiency class, e.g. 1 = IE1 (derived from IEC 60034-30)
    X Ex-approvalX = ATEXF = FMC = CSA
    2 Number of poles
    T Mains connection version:M = 1~T = 3~
    0015 Value/10 = rated motor power P2 in kW
    5 Frequency (5 = 50 Hz, 6 = 60 Hz)
    40 Code for rated voltage
    O Additional electrical equipmentO = with bare cable endF = float switch with bare cable endA = float switch with plugP = with plug

     

    Technical Data

    • Mains connection: 1~230 V, 50 Hz or 3~400 V, 50 Hz
    • Immersed operating mode: S1
    • Non-immersed operating mode: S2-30 min; S3 25%
    • Protection class: IP 68
    • Insulation class: F
    • Fluid temperature: 3…40 °C, max. 60 °C for 3 min
    • Max. immersion depth: 20 m
    • Cable length: 10 m

     

    Materials
    • Motor housing: EN-GJL-250
    • Hydraulics housing: EN-GJL 250
    • Impeller: EN-GJL 250 or EN-GJS-500-7
    • Static gaskets: NBR
    • Sealing on pump side: SiC/SiC
    • Sealing on motor side: C/MgSiO4
    • Shaft end: Stainless steel 1.4021

     

    Construction

    Submersible sewage pump as submersible monobloc unit for stationary and portable wet installation, as well as stationary dry installation.

    Hydraulics

    The outlet on the pressure side is designed as horizontal flange connection. The maximum possible dry matter is 8 % (depending on the hydraulics) Vortex and single-channel impellers are used.

    Motor

    The motor versions used are single-phase current and three-phase current surface-cooled motors. For single-phase current motors, the condenser is installed in a separate switchgear. Depending on performance, activation is carried out via direct startup or star/delta startup.

    The motor is cooled by the medium around it (pumped fluid or air). The waste heat is dissipated via the motor housing.

    The motors can be immersed during continuous duty (S1). In submerged operation, the operating modes S1 (continuous duty), S2 (short-time duty) or S3 (intermittent) are possible depending on the rated motor power.

    Furthermore the motors are equipped with the following monitoring devices:

    • Leakage detection motor compartment. The leakage detection signals water ingress into the motor compartment.
    • Thermal motor monitoringThe thermal motor monitoring protects the motor windings against overheating. Bimetallic strips are used for this as standard.

    The motor can also be fitted with an external sealing chamber electrode to monitor the sealing chamber. This signals if there is water ingress into the sealing chamber through the mechanical seal on the fluid side.

    The connection cable has bare cable ends, a length of 10 m as standard, and is longitudinally watertight.

    Seal

    Located between the motor and hydraulics is a sealing chamber with the seal on the fluid and motor side. This sealing chamber is filled with medicinal white oil. The fluid-side and motor-side seals are provided by two mechanical seals which rotate independently of each other.

     

    Accessories
    • Suspension unit or pump support foot
    • External sealing chamber monitoring for monitoring the sealing chamber
    • Switchgears, relays and plugs
    • Fixation sets with anchor bolts
    • Chains
    Options
    • IE3 motors
    • PTC sensor for winding monitoring
    • Motor windings to insulation class “H”
    • Static gaskets of Viton
    • Coating Ceram C0 for housing and impeller
    • Special voltages
  • Downloads

Why Wilo Pumps…

test

Self-Priming

test

Convenient

test

Highly-Efficient

test

Noise-Free

test

Diversity

test

Optimised Design

What Trebles Customers Think

We relied on Trebles expertise to ensure the right products were sourced for our project.

Top workmanship and a professional attitude from a supportive team

Excellent customer service again! You genuinely make my life so much easier

Excellent service and a company I would recommend to anyone in future

Engineers were very professional with an excellent knowledge of their trade

We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly

Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.

The team at Trebles were great. I really can’t praise them enough.

Not many providers would be able to fully breakdown & rebuild a booster on site