Trebles Supply & Commission New Booster Set for NHS 

As part of a preventative maintenance plan at the height of the pandemic, this large Nottinghamshire based hospital needed to replace its existing booster sets which had been in place since the hospital was first built in the early 2000s…

Helmet cog icon

Customer

Powergas; commercial heating engineers who specialise in offering a full range of gas services to ensure highest safety practices and reductions in energy costs.

Calculator icon

Challenge

Replacement of over 10 year old booster sets in one of Nottinghamshire’s largest NHS hospital trusts – With no disruption to A&E and maternity wards.

Lightbulb icon

Solution

7x Lowara 15kw Inverter driven SV46 multistage pumps, plus Hydrovar units. Sourced and delivered to site, plus commissioned by Trebles engineers.

save-energy 2

Benefits

No downtime at all during install. More economical and energy efficient solution than previous units used by the hospital.

NHS Covid Compliant Booster Set Replacement

As part of a preventative maintenance plan at the height of the pandemic, this large Nottinghamshire based hospital needed to replace its existing booster sets which had been in place since the hospital was first built in the early 2000s.

“Early in 2020 the hospital highlighted the need to look to replace its existing booster sets. This was when they contacted the Powergas team to assist with the job. The then sudden change to day-to-day running and risk management for the hospital caused by the Covid-19 outbreak, expedited the need to get replacement units in, in order to mitigate risk of any downtime.’

Carl Berridge, Managing Director, Powergas

Berridge continues,

‘On being commissioned to carry out the job, we turned to Trebles to assist with advising on the most economical, yet high quality products for the job. We have worked with Trebles for several years, so we know we can trust their technical expertise and ability to get the right products and turn them around within a quick timeframe – and this service was not affected at all by the Covid situation.”

Kingsmill Hospital

On delivery of the Lowara units to the hospital the Powergas team installed the pumps. Trebles engineers then went to the site to commission the sets.

Gary Stott, Area Manager, Trebles, adds,

“Jobs like this are the norm for us, however one area that added some extra challenges was Covid. This job was delivered and commissioned in the hospital during April – which was when everyone was having to quickly adapt to a very new but very different normal.”

Carl Berridge, closes,

“The very fact that this job was delivered and commissioned at the height of the pandemic but with no changes to the excellent service received, really is the best praise I can give the Trebles team. It goes some way to show that whatever the difficulty, Trebles can resolve it.”

GMT icon

“The very fact that this job was delivered and commissioned at the height of the pandemic but with no changes to the excellent service received, really is the best praise I can give the Trebles team. It goes some way to show that whatever the difficulty, Trebles can resolve it.”

Carl Berridge, Managing Director, Powergas

Contact us

Helping you to build and develop your business

"*" indicates required fields

Please attach any useful and relevant documents that might help speed things up (e.g. job spec)
Drop files here or
Max. file size: 50 MB.
    This field is for validation purposes and should be left unchanged.