Wilo-DrainLift BOX

Compact and fully-automatic sewage lifting unit for above-ground and concealed floor installation within buildings.

Enquire About This Product

  • Description

    Compact and fully-automatic sewage lifting unit for above-ground and concealed floor installation within buildings.

  • Advantages
    • Easy to install due to integrated pump and non-return valve
    • The large tank volume ensures a low number of switching processes
    • Easy maintenance
    • Stainless steel tile frame with trap
  • Technical Features

    Design

    Compact and fully-automatic sewage lifting unit for above-ground and concealed floor installation within buildings.

     

    Application

    • As a lifting unit within buildings (floor-mounted installation)
    • As a pump chamber within buildings (concealed floor installation)
    • For backflow resistant drainage of
      • Drainage points below the backflow level
      • Drainage points that cannot be drained via the natural downward slope.

     

    Liquid

    For collection and pumping of the following in domestic areas:

    • Sewage not containing faeces

    Sewage pumping according to 12050

    The pumps meet the requirements of EN 12050-2.

     

    Equipment/function
    • DrainLift BOX …
      • Submersible pump with thermal motor monitoring
      • Fitted float switch
      • Ready-to-plug

       

      DrainLift BOX … D

      • Submersible pump with thermal motor monitoring
      • Fitted float switch
      • Ready-to-plug

       

      DrainLift BOX … DS

      • Submersible pump with thermal motor monitoring
      • Separate float switch in pump chamber
      • Switchgear with mains-independent alarm and collective fault signal

     

    Typekey
    Example: Wilo-DrainLift BOX-32/11HD DS O
    BOX Sewage lifting unit for sewage free of faeces
    32 Nominal diameter discharge connection of the installed pump
    11 Max. delivery head in m
    HD HD = Pump for aggressive fluids
    D Lifting unit version:
    • E = Single-pump system
    • D = Double-pump system
    S Pump control:
    • Without = Pump with float switch
    • S = Switchgear with float switch
    O Installation type:
    • O = Floor-mounted installation
    • U = Concealed floor installation

     

    Technical Data

    • Mains connection: 1~230 V, 50 Hz
    • Discharge connection: 40 mm
    • Inlet connection: 110 mm (DN 100)
    • Ventilation connection: 110 mm (DN 100)
    • Tank volume: 113 l
    • Switching volume: 22 … 30 l
    • Switchgear protection class (for DS version): IP54

     

    Materials
    • DrainLift BOX-32 …
      • Pump chamber:
        • Tank: PE
        • Pipework: PE
        • Non-return valve: PE
      • Pump:
        • Pump housing: PP-GF30
        • Motor housing: 1.4301 (AISI 304)HD version: AISI 316L
        • Impeller: PPE/PS-GF20
        • Seal on the motor side: NBR
        • Seal on the fluid side: C/SIC (BQ1PFF)
        • Static seal: NBR

       

      DrainLift BOX-40 …

      • Pump chamber:
        • Tank: PE
        • Pipework: PE
        • Non-return valve: PE
      • Pump:
        • Pump housing: EN-GJL-200 (ASTM A48 Class 30)
        • Motor housing: 1.4301 (AISI 304)
        • Impeller: PK-GF30
        • Seal on the motor side: NBR
        • Seal on the fluid side: C/MgSi (BXPFF)
        • Static seal: NBR

     

    Accessories

    • Collar − to stop ground water from seeping into the concealed floor installation.
    • Alarm switchgears − to detect leakages.
    • Float switch − to detect high water levels.
    • Diaphragm pump − for emergency draining.
    • Stop valve
  • Downloads

Why Wilo Pumps…

test

Self-Priming

test

Convenient

test

Highly-Efficient

test

Noise-Free

test

Diversity

test

Optimised Design

What Trebles Customers Think

We relied on Trebles expertise to ensure the right products were sourced for our project.

Top workmanship and a professional attitude from a supportive team

Excellent customer service again! You genuinely make my life so much easier

Excellent service and a company I would recommend to anyone in future

Engineers were very professional with an excellent knowledge of their trade

We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly

Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.

The team at Trebles were great. I really can’t praise them enough.

Not many providers would be able to fully breakdown & rebuild a booster on site