DrainLift WS 1100

Enquire About This Product

  • Advantages
    • Deposit-free collecting space
    • High stability due to hemispherical shape of the bottom of the pump chamber
    • Four inlets can be selected onsite
    • Stainless steel pipes in V4A
  • Technical Data
    Design

    Plastic pump chamber for insertion into the ground

     

    Application

    Pumping of sewage containing faeces or pre-cleaned sewage that cannot be returned to the sewer system using natural falls, and for the draining of objects that are below the backflow level.

     

    Materials
    • Pump chamber: PE
    • Pipework: Stainless steel
    • Cross bar: Stainless steel
    • Gate valve: bronze
    • Non-return ball valve: Cast iron
    • Surface coupling: Cast iron
    • Chain: Stainless steel

     

    Construction

    Installation-ready plastic shaft with complete pipework as single or twin-head pump station for concealed floor installation. Plastic shaft with four inlets for flexible connection and four integrated fins for increased anti-buoyancy. The bottom of the shaft is semi-spherical in order to minimize deposits on the bottom of the shaft and maximize the stability of the form.

    Technical data

    • Inlet: 4x DN 150
    • Ventilation: 2x DN 100
    • Chamber cover for a maximum traffic load of 5 kN/m² (in accordance with DIN EN 124, Group 1)
    • Maximum pressure in the pressure pipe: 6 bar
  • Downloads

Why Wilo Pumps…

test

Self-Priming

test

Convenient

test

Highly-Efficient

test

Noise-Free

test

Diversity

test

Optimised Design

What Trebles Customers Think

We relied on Trebles expertise to ensure the right products were sourced for our project.

Top workmanship and a professional attitude from a supportive team

Excellent customer service again! You genuinely make my life so much easier

Excellent service and a company I would recommend to anyone in future

Engineers were very professional with an excellent knowledge of their trade

We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly

Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.

The team at Trebles were great. I really can’t praise them enough.

Not many providers would be able to fully breakdown & rebuild a booster on site