- Home
- Suppliers
- Ebara
- Control Panels & Systems
- Control Systems
- Mascontrol
Mascontrol
Automatic electronic device that regulates the operation of electric pumps without using pressure vessel and ensures their protection against dry running.
-
Description
Overview:
Automatic electronic device that regulates the operation of electric pumps without using autoclave tanks.
MASCONTROL (T) controls the pump’s start and automatic stop when a utility connected to the installation is opened or closed, keeping the pump running as long as any utility remains open, ensuring the required flow rate to the network.
The electronic device also provides dry run protection, automatic reset in case of dry run protection operation and an anti-blocking function.MASCONTROL (T) is available in 3 models
– Fixed restart 1.5bar
– Fixed restart 2.2bar
– Adjustable restart at 1.5-2-2.5-3bar (SET model)All MASCONTROL (T) devices are provided without pressure gauge
All MASCONTROL T are provided with cables as standard -
Technical Features
Technical data
Max. working pressure 12 bar Max. temperature of the liquid +60°C Protection degree IP65 Connections Threaded 1″¼ Max. phase current 16 A Main supply 230V ±10% Restart Fixed for Mascontrol 1.5-2.2 bar
Settable for Mascontrol LP SET - Downloads
Why Ebara Pumps…
Product Quality
Tailored Solutions
Eco-friendly
Multiple Sectors
Range of Products
Product Development
What Trebles Customers Think
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright