- Home
- Suppliers
- Ebara
- Control Panels & Systems
- Control Panels
- KIT WASTEK PRO 1-2
KIT WASTEK PRO 1-2
Electrical panels with microprocessor for 1 and 2 single-phase or three-phase electric pumps, ideal for the management and maintenance of the electric pump, thanks to the dedicated App. Supplied as standard with immersed pressure sensor and 10-metre hose, for lifting and drainage systems. Available with 1~230Vac 50/60Hz +/-10% (KIT WASTEK PRO-Mono) and 3~400Vac 50/60Hz +/-10% (KIT WASTEK PRO-Tri) power supply.
-
Description
Overview:
Electrical panels with microprocessor for 1 and 2 single-phase or three-phase electric pumps, ideal for the management and maintenance of the electric pump, thanks to the dedicated App (optional Bluetooth module).
Practical and versatile in terms of installation time and lower maintenance costs.
KIT WASTEK PRO, supplied as standard with immersed pressure sensor and 10-metre pipe. It is especially recommended for lifting and drainage systems.
Their main features are:• Power supply 1~230Vac 50/60Hz +/-10% (KIT WASTEK PRO-Mono)
• Power supply 3~400Vac 50/60Hz +/-10% (KIT WASTEK PRO-Tri)
• Wide range electronic transformer (single-phase 100-240Vac, three-phase 310-450Vac);
• Single pole or float level probe input for minimum level
• Immersed pressure sensor for managing up to 2 pumps with 10-metre pipe supplied as standard
• Service Mode operation to release parameters during maintenance;
• Electronic control of the current absorbed by the motor for thermal intervention (2 amperometric transformers for greater precision on the three-phase model)
• Acoustic warning and flashing light supplied as standard -
Downloads
Click Below to Download:
Why Ebara Pumps…
Product Quality
Tailored Solutions
Eco-friendly
Multiple Sectors
Range of Products
Product Development
What Trebles Customers Think
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright