- Home
- Suppliers
- Ebara
- Control Panels & Systems
- Control Panels
- DIRECTO 1-2-3
DIRECTO 1-2-3
Electromechanical control panel for one single-phase or three-phase electric pump (DIRECTO 1) and electromechanical control panel for two single-phase or three-phase electric pumps with integrated alternation and rescue system (DIRECTO 2).
-
Description
Overview:
Electromechanical control panel for one single-phase or three-phase electric pump (DIRECTO 1) and electromechanical control panel for two single-phase or three-phase electric pumps with integrated alternation and rescue system (DIRECTO 2).
Both are equipped with indicator lights for power on, thermal trip and engine running, manual or automatic switch, a mains switch interlocking door.
A terminal block allows the connection to utilities and external controls such as pressure switches, floats, etc. The DIRECTO 1 and DIRECTO 2 directly connect to the mains supply, which means full voltage start-up and constant frequency.
Drainage function and 24V alarm output.
Why Ebara Pumps…
Product Quality
Tailored Solutions
Eco-friendly
Multiple Sectors
Range of Products
Product Development
What Trebles Customers Think
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright