Grinder FX

Grinder FX by DAB is a submersible pump with shredder designed for lifting and transferring sewage water in commercial building services.

Enquire About This Product

  • Description
    Overview:

     

    Grinder FX by DAB is a submersible pump with shredder designed for lifting and transferring sewage water in commercial building services. Grinder FX is certified EN 12050-1. Thanks to the shredder, the pump is suitable for installations with small diameter pipes or those requiring high pressure. The shredding is in AISI 630 stainless steel. Quick-bonded resin-bonded cable gland. Ideal pump for replacements thanks to the reduced dimensions and theflanged and threaded delivery ports. Designed to allow fast maintenance thanks to a constructive solution that provides easy access to the main components of the pump. Single-phase versions with integrated capacitor available with float for automatic operation (MA) with powers up to 1,5 kW. In the three-phase versions the protection is the user’s responsibility. ATEX version available for use in potentially explosive environments (ATES certifications: II2G Ex db k IIB T4 or IEC EX: Ex db IIB T4 Gb).

  • Downloads

Why DAB Pumps…

test

Energy Saving

test

Quiet Operation

test

Easy Maintenance

test

Multiple Applications

test

Advanced Tech

test

Eco-friendly

What Trebles Customers Think

We relied on Trebles expertise to ensure the right products were sourced for our project.

Top workmanship and a professional attitude from a supportive team

Excellent customer service again! You genuinely make my life so much easier

Excellent service and a company I would recommend to anyone in future

Engineers were very professional with an excellent knowledge of their trade

We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly

Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.

The team at Trebles were great. I really can’t praise them enough.

Not many providers would be able to fully breakdown & rebuild a booster on site