- Home
- Suppliers
- DAB
- Pressure Units
- 2 NKVE 10, 15, 20 ADAC
2 NKVE 10, 15, 20 ADAC
The sets with on-board inverter have been designed and manufactured to meet the constant pressure requirements of modern system engineering solutions.
-
Description
Overview:
The sets with on-board inverter have been designed and manufactured to meet the constant pressure requirements of modern system engineering solutions. The constant pressure adjustment is a requirement in the most varied sectors: Water pipelines, Irrigation, Industry, Hotel, Residential building, Spas. The fundamental concept that has driven our Engineers in developing these pumps sets, was to offer a simple to use, flexible, and extremely reliable product.
Operating range: from 4 to 58 m3/h
Working pressure: 14 bar
Protection class: IP20
Liquid temperature range: from 0 °C to 80 °C. -
Downloads
Click Below to Download:
2 Nkve 10-15-20 ADAC – technical sheet
2 NKVE 10, 15, 20 – ADAC DAB instruction manual
Why DAB Pumps…
Energy Saving
Quiet Operation
Easy Maintenance
Multiple Applications
Advanced Tech
Eco-friendly
What Trebles Customers Think
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright