-
Description
Overview:
Easy to install, compact and plug and play pressurized system with multistage pumps and integrated pressure transducer for automatic control of starting/stopping of the pump when utilization
points are opened/closed with a integrated non-return valve into the pump suction.Applications
For water supply.
For domestic use, for garden use and irrigation.Operating conditions
Liquid temperature: 0 °C to +50 °C.
Ambient temperature up to +40 °C.
Maximum permissible pressure in the pump casing: 8 bar.
Continuous duty.Features
• high efficiency asynchronous motor
• capacitor less stressed in voltage
• uniform and lower motor temperature
• motor power control
• programmable re-start pressure
• programmable stop pressure
• no hydraulic losses due to the measuring devices
• voltage and current control
• monitoring of maximum starting currentProtections
• dry-run protection
• overload control and overheating motor control
• pump blockage
• power supply control
• starts per hour control -
Technical Features
Technical data
FLOW
1 / 7.2
mc / hHEAD
8 / 56
mPOWER
0.45 /1×2
kW - Downloads
Why Calpeda Pumps…
Cost-effective
Environmental Impact
Reliable
Durable
Versatility
Innovative Features
What Trebles Customers Think
We relied on Trebles expertise to ensure the right products were sourced for our project.
Matthew Gidley – Senior Contracts Engineer, JS Wright
Top workmanship and a professional attitude from a supportive team
Richard Leek – Project Manager, Marshdale
Excellent customer service again! You genuinely make my life so much easier
Anthony Gooding – Director, HSP
Excellent service and a company I would recommend to anyone in future
Jason Goldsmith – Supervisor, Interserve
Engineers were very professional with an excellent knowledge of their trade
Martin Deakin – Gas Surveyor, Bromford
We’re writing to express our sincere thanks to all who help ensure our hospitals are able to run smoothly
Richard Hill – Estates Manager, London Road Community Hospital
Job delivered and commissioned at the height of the pandemic with no changes to the excellent service we always receive.
Carl Berridge – MD, Powergas
The team at Trebles were great. I really can’t praise them enough.
Richard Beard – Club Secretary, Belvedere Park FC
Not many providers would be able to fully breakdown & rebuild a booster on site
Clive Bradley – Senior Contracts Engineer, JS Wright